Tuesday, December 10, 2013

Course Renovation Process



The construction is still proceeding during this cold snap as we can say the back 9 traps are cored out and graveled. Due to the moisture levels in the gravel, we will be postponing the spraying of the gravel until warmer and more consistent weather appears. Starting this week, the crew will be coring out traps on #6 and heading back to #5, #4 weather depending.

Attached is a picture of Hole #14. After a quick redesign of the left side trap, we elected to fill in a great majority of the old trap while increasing the traps width closer to the green.

Thanks again

Craig Kight